Metlifecare Somervale

All projects

Commercial

·

Mount Maunganui

Metlifecare Somervale

Two stages of a retirement village build: high-fibre rib-raft floors, podium and raft slabs and a concrete pool, delivered on programme.

Client

Metlifecare

Location

Mount Maunganui

Industry

Commercial

Main contractor

Fosters (Stage 1), Watts & Hughes (Stage 2)

Completed

2024

Overview

Trusted across both stages

Stage 1, for Fosters, was the main build: about 3,400 m² of high-fibre rib raft and slabs (Dramix steel fibre at 35 kg/m³) plus external concrete. It included 400 mm and 600 mm rib-raft floors with over 800 m³ of high-fibre concrete, a 3 m by 3 m lift pit, starters for tilt panels and more than 25 cast-in bolts and rebates.

Stage 2, for Watts & Hughes, was single-storey builds on a very tight programme, with a podium floor, 300 and 400 raft slabs, a concrete pool and CLT installation. Both stages were delivered on programme with a high-end finish.