Civil

·

Te Puke, Bay of Plenty

Te Puke Wastewater Treatment Plant

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Insitu concrete structures, tank walls and slabs delivered for a live treatment facility.

Client

Western Bay of Plenty District Council

Location

Te Puke, Bay of Plenty

Industry

Civil

Main contractor

McConnell Dowell

Value

$500k - $1M

Duration

14 weeks

Completed

2026

Overview

Heavy civil concrete, poured without stopping the plant

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis.

“Lorem ipsum dolor sit amet, consectetur.”

Scope of works

  • Insitu formwork and concrete
  • Reinforced tank walls
  • Raft slabs and footings
  • Culverts and channels
  • Kerbing and hardstand
  • Concrete cutting and scanning

From above

The site from the air

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Drone footage captured at completion.

Client feedback

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt.

First Last

·

Project Manager

McConnell Dowell

Crew on site at Te PukeIllustration featuring the text 'OFF THE WALL' with construction elements and tools around, and the phrase 'OFF THE WALL CONSTRUCTION WHANAUNGATANGA' below.

Delivered safely

Work with us

Got a project like this one?

Let’s talk! OTWC has the expertise to get it done right, from the first pour to the final finish.

Get a Quote07 542 5438